
Smelting Works Tier 3
house
Contents
item
Blast ShuttersSmelting Works Tier 3
The following residents move to your settlement:
Underhive Scum.
Convert Material:
Any surplus Building items can be melted down in the Slag Furnace and reformed in the smelting works as barricades or upgraded barricades for settlement walls.
Tier-3 smelting works and slag furnace required for this action.